| 1 |
MEETING WITH OWNER AND ARCHITECT AND/OR SHIPYARD |
| |
 |
| |
We participate in defining the preliminary general arrangement.
- Layout of the passenger areas
- Layout of the crew areas
- Food handling (lifts, corridors)
- Food storage (positive, freezer, dry etc…)
- Food flow
- Waste flow . |
|
| |
| 2 |
BASED ON THE PRELIMINARY GENERAL ARRANGEMENT WE START WITH A BLANK PAGE TO : |
| |
| |
DESIGN LAYOUT DRAWING (Example) |
| |
|
|
| |
|
| |
SPECIFY EQUIPMENT LIST (Example with cost budgeting) |
| |
|
| You can use this specification as a contractual document |
|
| |
|
| |
SPECIFY TURNKEY (Example) |
| |
|
| |
- description of the main components
|